
Gas Turbine Inlet Air Filter
Filters for the gas turbine air intake systems of cogeneration and combined-cycle power plants. We build them to the same dimensions and grade from your drawings or current product specifications, and handle shipping and on-site delivery to the plant ourselves.
Features
- Two-stage set: GT Air Intake Pre (G4 pocket) and Final (E11 V-Bank) filters
- Inlet Air Filters made in cylindrical and conical types
- Rated to ASHRAE 52.2, EN 779 and EN 1822 test standards
- Custom builds to plant drawings and regular replacement supply
Specifications
| Product | Size (mm) | Test standard | Filter class | Type |
|---|---|---|---|---|
| GT Inlet Air Filter | 445 × 332 × 660 | ASHRAE 52.2 | MERV 15 | Cylindrical |
| GT Inlet Air Filter | 445/324 × 332/215 × 660 | ASHRAE 52.2 | MERV 15 | Conical |
| GT Inlet Air Filter | 212(ID) × 324(OD) × 660L | ASHRAE 52.2 | MERV 12 | Cylindrical |
| GT Inlet Air Filter | 330/212(ID) × 445/324 × 660L | ASHRAE 52.2 | MERV 12 | Conical |
| GT Air Intake Pulse | 324(OD) × 660(L) | EN779 | EN F9 | Cylindrical |
| GT Air Intake Final | 592 × 592 × 292 | EN1822 | EN E11 | V-Bank |
| GT Air Intake Final | 592 × 592 × 400 | EN1822 | EN E11 | V-Bank |
| GT Air Intake Pre | 500 × 500 × 220 | EN779 | EN G4 | Pocket Filter |
Sizes not listed can be made to your drawings or the dimensions of your current filter.
Applications
Key customers
- Korea District Heating Corp. — Hwaseong & Dongtan branches
- Korea Southern Power — Shin-Incheon Bitdream Headquarters
- Korea East-West Power — Ulsan Regional Headquarters (Ulsan Combined Cycle #2, #3)
Power plant gas turbine inlet filters
Korea District Heating Corp. · Korea Southern Power · Korea East-West Power
We supplied GT Air Intake Pre and Final filters and Inlet Air Filters for the gas turbines of cogeneration and combined-cycle power plants. Filters made at our factory are trucked directly into the plant’s gas turbine building.
More delivery cases →



